Piedmont Lithium Presents the September 2019 Quarterly Report

NEW YORK – Piedmont Lithium Limited (ASX: PLL; NASDAQ: PLL) (“Piedmont” or “Company”) is pleased to present its September 2019 quarterly report. Highlights during and subsequent to the quarter were:

  • Completed an updated Scoping Study for the fully-integrated Project, which was managed by independent consultants, Primero Group Limited, and delivered outstanding results including:

    • a 25-year mine life and compelling economics including an NPV of US$1.45 billion and an after-tax IRR of 34%, due to attractive capital and operating costs;
    • a chemical plant producing 22,700tpa of lithium hydroxide supported by an open pit mine and concentrator producing 160,000tpa of 6% spodumene concentrate; and
    • by-product quartz (86,000tpa), feldspar (125,000tpa), and mica (13,000tpa) providing credits to the cost of lithium production;
  • In response to strong interest from prospective lithium hydroxide customers, the Company has decided to accelerate development of its lithium chemical plant by compressing its project timeline into a single-stage, effectively accelerating chemical plant development by one year while deferring the mine/concentrator construction start date by one year, resulting in integrated operations from day one.
  • Completed PFS-level metallurgical test work demonstrating high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from representative samples using a combination of Dense Medium Separation (“DMS”) and flotation technology;
  • Continued the 25,000-meter Phase 4 drill program, where a total of 103 holes have been completed to date for a total of 17,187 meters;
  • Completed Mineral Resource estimates and bench-scale metallurgical testwork for by-product quartz, feldspar and mica as by-products of spodumene concentrate from the Project. The Mineral Resource estimates were prepared by independent consultants, CSA Global Pty Ltd;
  • Continued numerous preliminary off-take, financing and strategic conversations, including companies from the lithium, mining, chemicals, battery, automotive and private equity sectors;
  • Completed an institutional placement of 145 million shares at A$0.145 per share to raise gross proceeds of A$21 million, led by cornerstone investor, Fidelity International (“Fidelity”) and the Company’s largest shareholder, AustralianSuper.

Next steps:

  • Complete permitting to commence mining and processing operations at the Project;
  • Commence permitting for the chemical plant in Q4 2019;
  • Commence lithium hydroxide testwork in Q4 2019;
  • Complete pre-feasibility study (“PFS”) for the chemical plant in Q2 2020;
  • Continue offtake discussions for lithium hydroxide with participants in the global battery supply chain; and
  • Continue to evaluate strategic partnering options.

Click here to view the full ASX Release.

Keith D. Phillips

President & CEO

T: +1 973 809 0505

E: keith@piedmontlithium.com

Anastasios (Taso) Arima

Executive Director

T: +1 347 899 1522

E: taso@piedmontlithium.com


Piedmont Lithium and AMCI to Partner to Market By-Products

  • Piedmont and Ion Carbon & Minerals, LLC (“Ion”), a division of the AMCI Group, have executed a letter of intent to partner to market the quartz, feldspar and mica to be produced at the Piedmont Lithium Project
  • Ion has strong relationships with industrial minerals customers throughout the United States
  • Ongoing testwork at SGS Lakefield will support sales and marketing efforts
  • Quartz, feldspar, and mica will provide important credits to lithium hydroxide production costs

 

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is pleased to announce that it has entered into a Letter of Intent (“LOI”) with Ion Carbon & Minerals, LLC (“Ion”) to partner to market the quartz, feldspar, and mica produced at the Company’s Piedmont Lithium Project (“Project“).

Ion is wholly owned by the AMCI Group, a leading specialist natural resources investor and marketer with a long-standing track record of success across a broad range of commodities. Ion has an extensive client base in North America which Piedmont and Ion will leverage to gain access to regional industrial minerals markets in the United States.

The LOI sets out the key terms on which Piedmont and Ion propose to partner for by-product marketing, including:

  • The partnership will have exclusive rights to market quartz, feldspar, and mica production from the Project under a formal Marketing Agreement to be prepared on mutually agreeable terms and conditions;
  • The partnership will have an initial term of five years, with an option to extend for an additional five years by mutual agreement; and
  • The partnership will be owned and controlled by Ion and Piedmont and governed by a formal Operating Agreement to be prepared on mutually agreeable terms and conditions.

Ongoing testwork at SGS Lakefield will produce commercial by-product samples from Piedmont ore for delivery to prospective customers.

Keith D. Phillips, President and Chief Executive Officer, commented: “We are very pleased to be partnering with Ion to develop the markets for our important mineral by-products. Quartz, feldspar and mica represented a significant proportion of the revenue for the lithium mines operated in North Carolina from the 1950s to the 1990s. These are significant and growing markets, particularly in the southeast where much of America’s glass, ceramics and building products production is based. North Carolina alone is home to pure quartz, feldspar and mica mines, but mine depletions over the past several years have led to imports taking significant market share. Piedmont is ideally located to enter these markets and should be a low-cost producer given the by-product nature of our activities. We hope to secure important customer relationships over the course of 2020 to provide more clarity to the positive economic impact by-products should have on our Project.”

Click here to view the full ASX Announcement.

Keith D. Phillips | President & CEO

T: +1 973 809 0505

E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima | Executive Director

T: +1 347 899 1522

E: tarima@piedmontlithium.com


Piedmont Accelerating Lithium Hydroxide Strategy

  • Strong customer interest driving accelerated timeline
    • Piedmont in discussions with numerous prospective lithium hydroxide customers
    • Lithium hydroxide demand projected to grow 35% per annum through 2025
    • Customers aggressively seeking ex-China supply
    • Piedmont uniquely positioned to supply US and European markets
  • Piedmont project to be developed on an integrated basis targeting commissioning in H2 2022
    • Mine and concentrator permitting ongoing with federal permits expected in Q4 2019
    • Lithium hydroxide testwork and chemical plant permitting to commence in Q4 2019
    • Chemical Plant PFS expected in Q2 2020 prior to integrated DFS
    • Offtake agreements for lithium hydroxide expected to underpin project financing

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is pleased to announce that in response to strong interest from prospective lithium hydroxide customers, the Company is accelerating development of its lithium chemical plant and is compressing its Project timeline into a single-stage targeting lithium chemical production in late-2022. This new timeline will effectively accelerate chemical plant development by one year while deferring the mine/concentrator construction start date by one year, resulting in integrated operations from day one. This integration should lead to improved project economics given the higher margins associated with the lithium chemical business, while eliminating spodumene concentrate sales into the Chinese market.

The Company is focused on several important near-term milestones including:

  • Key federal permit for the mine and concentrator expected Q4 2019
  • Lithium hydroxide testwork commencing in Q4 2019 with chemical plant pre-feasibility study (“PFS”) anticipated in Q2 2020
  • Integrated definitive feasibility study (“DFS”) and chemical plant permitting targeted for Q4 2020
  • Offtake discussions advancing with numerous participants in the global battery supply chain
  • Marketing efforts related to byproduct quartz, feldspar and mica are well advanced
  • Strategic partnering options being continually evaluated

The Company has a strong cash balance of ~US$14M (~A$21M) and is well-positioned to accelerate the work required to commence construction of the integrated lithium hydroxide project to leverage anticipated shortfalls in lithium hydroxide supply beginning in 2023.

Keith D. Phillips, President and Chief Executive Officer, commented: “Over the past several months we have engaged in encouraging dialogue with prospective customers throughout the lithium supply chain. Themes that are common to all the discussions are: (a) the dramatic growth in lithium hydroxide required to support the EV platforms currently being developed; (b) the strong desire of lithium customers to diversify their supply sources away from the dominant China market; and (c) the concrete plans of selected parties to aggressively develop their battery supply chains in the United States and Europe. Nobody is better positioned than Piedmont Lithium to capitalize on these developments. Ours is the only spodumene project in the United States, and it is the only US lithium project focused on the fast-growing hydroxide market. We are ideally located to serve the rapidly growing battery supply chains in both the United States and Europe.

Click here to view the full ASX Announcement.

Keith D. Phillips | President & CEO

+1 973 809 0505

kphillips@piedmontlithium.com

Anastasios (Taso) Arima |Executive Director

+1 347 899 1522

tarima@piedmontlithium.com


Piedmont Lithium: Updated Scoping Study Extends Project Life and Enhances Exceptional Economics

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is pleased to report the results of the updated Scoping Study for its vertically integrated lithium hydroxide chemical project located in North Carolina, USA. The Scoping Study includes a steady-state 22,700 tonnes per year (“t/y“) lithium hydroxide (“LiOH“) Chemical Plant supported by a Mine/Concentrator producing 160,000t/y of 6% Li2O spodumene concentrate. By-products quartz, feldspar, and mica will provide credits to the cost of lithium production.

This updated Scoping Study incorporates the expanded Mineral Resource update published in June 2019 which has extended the overall project life to 25 years. The Scoping Study features:

  • Integrated project to produce 22,700t/y of LiOH
  • 25-year project life with 2 years of concentrate-only sales and 23 years of integrated operations
    • More than 100% increase in life-of-project LiOH production compared with prior studies
  • 1st quartile operating costs
    • Lithium hydroxide cash costs of US$3,105/t (AISC of US$3,565/t)
    • Spodumene concentrate cash costs of US$199/t (AISC of US$238/t)
  • Exceptional project economics
    • NPV8% of US$1.45B
    • After-tax IRR of 34%
    • Steady-state annual average EBITDA of US$298M
  • Mine/Concentrator engineering and metallurgical testwork completed to PFS-level
  • Conventional technology selection in all project aspects

Keith D. Phillips, President and Chief Executive Officer, said:

“We are very pleased with the results of the updated Scoping Study, which reflect the benefits of a 25-year mine life, a refined concentrator flow sheet and PFS-level engineering and metallurgy. The economic benefit of developing an integrated lithium chemical business in North Carolina, USA is clear, driven by the exceptional infrastructure and human resource advantages of our location, as well as the competitive royalty and tax regime offered in the United States.

“Recent corporate transactions (i.e. Wesfarmers/Kidman and Albemarle/Wodgina) have reinforced the wisdom of the Company’s integrated business strategy. We will continue to progress our Mine/Concentrator through the permitting and feasibility processes, but we will now redouble our efforts on the strategic front by accelerating our lithium hydroxide testwork and intensifying the initial strategic discussions we have had with a broad array of potential strategic, offtake and financial partners.”

To view the full ASX Announcement, click here.

Keith D. Phillips


President & CEO

+1 973 809 0505

kphillips@piedmontlithium.com

Anastasios (Taso) Arima


Executive Director

+1 347 899 1522

tarima@piedmontlithium.com


Piedmont Lithium Upcoming Conference Participation

NEW YORK –
Piedmont Lithium Limited (Nasdaq:PLL; ASX:PLL) is pleased to announce that it will be participating in the following upcoming conferences:

Event:

Canaccord Genuity – The Future of Transport Conference

Date:

August 6, 2019

Location:

Boston, Massachusetts

 

 

Event:

Jefferies – Global Industrials Conference

Date:

August 7 – 8, 2019

Location:

New York, New York

 

 

Event:

9th Annual Gateway Conference

Date:

September 4 – 5, 2019

Location:

San Francisco, California

About Piedmont Lithium

Piedmont Lithium Limited (ASX: PLL; Nasdaq: PLL) holds a 100% interest in the Piedmont Lithium Project located within the Carolina Tin-Spodumene Belt (“TSB”) and along trend to the Hallman Beam and Kings Mountain mines, which historically provided most of the western world’s lithium between the 1950s and the 1980s. The TSB has been described as one of the largest lithium regions in the world and is located approximately 25 miles west of Charlotte, North Carolina.

In September 2018 the Company published a Scoping Study for an integrated lithium hydroxide business based on a maiden Mineral Resource estimate of 16.2 million tonnes (“Mt”) grading at 1.12% Li2O which featured a 13-year project life, NPV8 of US$888 million, a US$3,112 per tonne lithium hydroxide operating cost, and a US$193 per tonne spodumene concentrate operating cost.

Forward Looking Statements

This announcement may include forward-looking statements. These forward-looking statements are based on Piedmont’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Piedmont, which could cause actual results to differ materially from such statements. Piedmont makes no undertaking to subsequently update or revise the forward-looking statements made in this announcement, to reflect the circumstances or events after the date of that announcement.

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources

The information contained in this announcement has been prepared in accordance with the requirements of the securities laws in effect in Australia, which differ from the requirements of U.S. securities laws. The terms “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral resource” are Australian terms defined in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). However, these terms are not defined in Industry Guide 7 (“SEC Industry Guide 7”) under the U.S. Securities Act of 1933, as amended (the “U.S. Securities Act”), and are normally not permitted to be used in reports and filings with the U.S. Securities and Exchange Commission (“SEC”). Accordingly, information contained herein that describes Piedmont’s mineral deposits may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder. U.S. investors are urged to consider closely the disclosure in Piedmont’s Form 20-F, a copy of which may be obtained from Piedmont or from the EDGAR system on the SEC’s website at http://www.sec.gov/.

Competent Persons Statement

The information in this announcement that relates to Exploration Results is based on, and fairly represents, information compiled or reviewed by Mr. Lamont Leatherman, a Competent Person who is a Registered Member of the ‘Society for Mining, Metallurgy and Exploration’, a ‘Recognized Professional Organization’ (RPO). Mr. Leatherman is a consultant to the Company. Mr. Leatherman has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Leatherman consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The Project’s Mineral Resource of 16.2Mt @ 1.12% Li2O comprises Indicated Mineral Resources of 8.5Mt @ 1.15% Li2O and Inferred Mineral Resources of 7.7Mt @ 1.09% Li2O. The information in this announcement that relates to Exploration Targets and Mineral Resources is extracted from the Company’s ASX announcement dated June 14, 2018 which is available to view on the Company’s website at www.piedmontlithium.com. The information in this announcement that relates to Metallurgical Testwork Results is extracted from the Company’s ASX announcements dated September 4, 2018 and July 17, 2018 which are available to view on the Company’s website at www.piedmontlithium.com. The information in this announcement that relates to Process Design, Process Plant Capital Costs, and Process Plant Operating Costs is extracted from the Company’s ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Company’s website at www.piedmontlithium.com. The information in this announcement that relates to Mining Engineering and Mine Schedule is extracted from the Company’s ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Company’s website at www.piedmontlithium.com.

Piedmont confirms that: a) it is not aware of any new information or data that materially affects the information included in the original ASX announcements; b) all material assumptions and technical parameters underpinning Mineral Resources, Exploration Targets, Production Targets, and related forecast financial information derived from Production Targets included in the original ASX announcements continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this report have not been materially modified from the original ASX announcements.

Investors interested in meeting with Piedmont at or around these events should contact:

Keith D. Phillips

President & CEO

T: +1 973 809 0505

E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima

Executive Director

T: +1 347 899 1522

E: tarima@piedmontlithium.com


Piedmont Lithium Announces Significant Increase in By-Product Mineral Resources

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is pleased to announce updated Mineral Resource estimates for mineral by-products quartz, feldspar and mica from spodumene bearing pegmatites on the Company’s wholly-owned Core property located within the world-class Carolina Tin-Spodumene Belt (“TSB”) in North Carolina, USA (refer Table 1). This is an update to the initial by-product Mineral Resource estimate reported in September 2018.

By-Product Mineral Resource estimates were based on normative mineralogy compositions from 326 drill holes previously analyzed for lithium. The resource details for quartz, feldspar and mica are shown in Table 1. The Mineral Resource estimates have been prepared by independent consultants, CSA Global Pty Ltd (“CSA Global”) and are reported in accordance with the JORC Code (2012 Edition).

 

Table 1: Mineral Resource Estimates for By-Products – Piedmont Lithium Project

Category

Tonnes

(Mt)

Quartz

Feldspar

Mica

Grade

(%)

Tonnes (Mt)

Grade

(%)

Tonnes (Mt)

Grade

(%)

Tonnes (Mt)

Indicated

12.5

30.0

3.75

44.4

5.55

4.5

0.56

Inferred

12.6

28.7

3.61

44.4

5.58

4.4

0.56

Total

25.1

29.3

7.36

44.4

11.13

4.5

1.12

 

In June 2019, the Company reported an updated lithium Mineral Resource for the Core property of 25.1 million tonnes (“Mt”) at a grade of @ 1.09% Li2O. The by-products and lithium Mineral Resource estimates utilize the same geologic model. Piedmont is now updating the Project’s Scoping Study which will include the updated by-product resources and the June 2019 lithium resource.

Keith D. Phillips, President and Chief Executive Officer, commented: “The historic lithium mines in the Carolina Tin-Spodumene Belt generated a material portion of their economics from the sale of by-product minerals quartz, feldspar and mica to the large, local southeastern US industrial markets. These markets have continued to grow, and are currently served in part by high-cost imported material. We expect by-products to represent a significant – and unique – opportunity for Piedmont, and I would note that in our Scoping Study dated September 12, 2018 the by-product credits effectively reduced our cash production costs of lithium hydroxide by more than $750/t, and we expect a similar impact in our study update due next week.

To view the full ASX Announcement, click here.

Keith D. Phillips | President & CEO

T: +1 973 809 0505

E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima |Executive Director

T: +1 347 899 1522

E: tarima@piedmontlithium.com


Piedmont Lithium June 2019 Quarterly Report

NEW YORK – Piedmont Lithium Limited (ASX: PLL; NASDAQ: PLL) (“Piedmont” or “Company”) is pleased to present its June 2019 quarterly report. Highlights during and subsequent to the quarter were:

  • Increased total Mineral Resources for the Piedmont Lithium Project (“Project”) by 72% to 27.9 million tonnes (“Mt”) at a grade of 1.11% Li2O following:

    • anupdated Mineral Resource estimate for the Company’s Core property, increasing the Core property Mineral Resources to 25.1 Mt at a grade of 1.09% Li2O; and
    • an initial Mineral Resource estimate for the Company’s Central property, located approximately one mile south of the Core property, of 2.8 Mt at a grade of 1.34% Li2O.
  • Completed mineralogical analysis on samples of mineralized pegmatites and composite samples from the Project demonstrating that lithium occurs almost exclusively within spodumene in the Project’s ore body.
  • Completed PFS-level metallurgical test work demonstrating high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from representative bulk samples using a combination of Dense Medium Separation (“DMS”) and flotation technology.
  • Continued the 25,000-meter Phase 4 drill program, where a total of 94 holes have been completed to date for a total of 15,738 meters.
  • Substantially completed engineering for the planned Scoping Study update to integrate updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs.
  • Continued numerous preliminary off-take, financing and strategic conversations, including companies from the lithium, mining, chemicals, battery, automotive and private equity sectors.
  • After quarter end, on July 10th, Piedmont completed an institutional placement of 145 million shares at A$0.145 per share to raise gross proceeds of A$21 million, led by cornerstone investor, Fidelity International (“Fidelity”) and the Company’s largest shareholder, AustralianSuper.

Next steps:

  • Complete an updated Scoping Study based on updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs.
  • Continue Phase 4 drilling and expansion of the Company’s land position in the Carolina Tin-Spodumene Belt (“TSB”) with a focus on areas of high mineral prospectivity.
  • Complete permit applications and secure the necessary permits and approvals to commence mining and processing operations at the Project.
  • Advance development of the Company’s proposed lithium hydroxide chemical plant including metallurgical testwork for the conversion of spodumene concentrate produced from Piedmont ore.

To view the full ASX Announcement, click here.

Keith D. Phillips

President & CEO
T: +1 973 809 0505

E: keith@piedmontlithium.com

Anastasios (Taso) Arima

Executive Director

T: +1 347 899 1522

E: taso@piedmontlithium.com


Piedmont Lithium Announces Outstanding PFS-level Metallurgical Results

  • Testwork confirms ability to produce high-grade, low impurity spodumene concentrate
  • Flow sheet adjusted to incorporate a combination of DMS and flotation processing
  • Process simulations based on testwork results support a design basis of 85% lithium recovery
  • Mineralogy shows spodumene as the only lithium bearing mineral in concentrate
  • Optimization to further improve recoveries will be undertaken during Definitive Feasibility Study
  • Updated flow sheet will be reflected in a Scoping Study update expected in the next 30 days

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is pleased to announce positive results from pre-feasibility study (“PFS”) level metallurgical test work conducted on composite samples of ore from the Piedmont Lithium Project (“Project”) performed at SGS testing laboratories in Lakefield, Ontario.

Dense Medium Separation (“DMS”) and flotation Locked-Cycle Tests (“LCT”) test work results showed high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from composite samples. Piedmont test results compare favorably in several quality categories with the reported shipments of three emerging Australian spodumene producers.

Table 1: Results of Dense Medium Separation + Locked Cycle Flotation Test Results (Composite Sample 1)

Sample

Feed

Grade

Li2O (%)

Concentrate

Grade Li2O

(%)

Fe2O3 (%)

Na2O (%)

K2O (%)

CaO+

MgO +

MnO (%)

P2O5 (%)

Piedmont Composite Sample 1

1.11

6.35

0.93

0.63

0.49

0.96

0.32

Australian Producer 1

NR

6.00

1.20

NR

NR

NR

NR

Australian Producer 2

NR

5.90

1.50

NR

NR

NR

NR

Australian Producer 3

NR

6.10

0.61

0.80

0.76

0.79

0.30

NR: Not Reported

The composite samples were prepared to approximate the average grade of the Project’s ore body. Overall lithium recovery during testwork for the preferred flowsheet was 77% at a grade of 6.35% Li2O. Simulations based on the testwork results support an overall plant design recovery of 85% when targeting a 6.0% Li2O spodumene concentrate product. Further optimization will be undertaken in a future feasibility level pilot testwork program.

The Company’s forthcoming Scoping Study update will incorporate the updated flow sheet developed during this test work program. The benefit of incorporating DMS technology into the flow sheet will be reduced operating costs and accelerated ramp-up.

Keith D. Phillips, President and Chief Executive Officer, commented: “We are very pleased with the results of this PFS-level testwork program, which confirms the outstanding mineralogy and metallurgy of the Piedmont Lithium Project. We look forward to reflecting these strong results in our forthcoming Scoping Study update, which will also incorporate the substantially larger mineral resource announced in June as well as several other constructive refinements.

Click here to view the full ASX Announcement.

Keith D. Phillips

President & CEO

T: +1 973 809 0505

E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima

Executive Director

T: +1 347 899 1522

E: tarima@piedmontlithium.com


Piedmont Increases Lithium Resource by 47% to 27.9 Million Tonnes

  • 47% increase in Piedmont Project-wide Mineral Resource estimate to 27.9 Mt @ 1.11% Li2O
  • 55% increase in Mineral Resource estimate on Core property to25.1 Mt @ 1.09% Li2O
  • 74% of the Core property resource is within 100m of surface and 97% is within 150m of surface
  • 100% of the lithium resource is attributed to spodumene mineralization
  • Core property Resource is based on 326diamond coreholes totalling over 51,000 meters
  • 9,450 meters of drilling remain in Phase 4 drill campaign with numerous highly prospective targets

 

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is pleased to announce a major update to the Mineral Resource estimate for the Company’s wholly-owned Piedmont Lithium Project (“Project”) located within the world-class Carolina Tin-Spodumene Belt (“TSB”) in North Carolina, USA (Table 1).

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20190625005273/en/

Figure 1:  Piedmont Lithium Project Showing Resource, Resource Shells and New Exploration Target Areas (Graphic: Business Wire)

Figure 1:  Piedmont Lithium Project Showing Resource, Resource Shells and New Exploration Target Areas (Graphic: Business Wire)

The Mineral Resource for the Core property has increased to 25.1 million tonnes (“Mt”) at a grade of 1.09% Li2O, bringing the Project’s total Mineral Resources to 27.9 Mt at a grade of 1.11% Li2O, containing 309,000 tonnes of lithium oxide (“Li2O”) or 764,000 tonnes of lithium carbonate equivalent (“LCE”) (the benchmark used in the lithium industry).

Table 1: Project Wide Mineral Resource Estimate for the Piedmont Lithium Project (0.4% cut-off)

Resource Category

Core property

Central property

Total

Tonnes (Mt)

Grade (Li2O%)

Tonnes (Mt)

Grade (Li2O%)

Tonnes (Mt)

Grade (Li2O%)

Li2O

(t)

LCE

(t)

Indicated

12.5

1.13

1.41

1.38

13.9

1.16

161,000

398,000

Inferred

12.6

1.04

1.39

1.29

14.0

1.06

148,000

366,000

Total

25.1

1.09

2.80

1.34

27.9

1.11

309,000

764,000

Importantly, 74% of the Core Mineral Resource is within 100m of surface and 97% is within 150m of surface. Approximately 50%; or 12.5 million tonnes of the Mineral Resource is classified in the Indicated Resource category. All of the Mineral Resource tonnes at both Core and Central properties are attributable to spodumene mineralization.

The Company expects to complete a pre-feasibility level metallurgical testwork program followed by a Scoping Study update in July 2019.

Keith D. Phillips, President and Chief Executive Officer, commented: “We are very pleased with the resource update at our Core property, bringing our total project-wide resources to 27.9Mt at 1.11% Li2O. As we expand our land holdings and drill out other highly prospective targets, we are optimistic that we will ultimately identify North America’s largest spodumene ore body. This scale, combined with high grade, strong mineralogy and metallurgy, and our superior location in North Carolina, all support the unique strategic nature of the Piedmont Lithium Project.

Click here to view full ASX Release.

Keith D. Phillips | President & CEO

T: +1 973 809 0505

E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima |Executive Director

T: +1 347 899 1522

E: tarima@piedmontlithium.com


Pure Spodumene Nature of Piedmont Lithium Ore Body

  • XRD analysis confirms pure spodumene nature of Piedmont’s ore body
    • Absence of petalite and lepidolite in pegmatites expected to
      lead to high lithium recovery
  • Mineralogy consistent across Piedmont’s Core, Central, and
    Sunnyside properties
  • Piedmont on-track to release Resource, Metallurgy and Scoping Study
    updates in the next 60 days

NEW YORK – Piedmont Lithium Limited (“Piedmont” or “Company”) is
pleased to announce the completion of mineralogical analysis on samples
of mineralized pegmatites and composite samples from Piedmont’s Core,
Central, and Sunnyside Properties. All testwork to date effectively
demonstrates that lithium occurs almost exclusively within spodumene in
Piedmont’s mineral resource.

This press release features multimedia. View the full release here:
https://www.businesswire.com/news/home/20190618005279/en/

Distribution of XRD Samples from Mineralized Pegmatites from Piedmont Properties (Graphic: Business  ...

Distribution of XRD Samples from Mineralized Pegmatites from Piedmont Properties (Graphic: Business Wire)

 
Table 1: Average XRD Analysis Results from 46 Drill Core and
Composite Samples of Piedmont Ore
Mineralogy     Average Wt. (%) of Mineral Types
Core Property     Central Property     Sunnyside Property
    Semi-quantitative Samples

(13 Samples)

    Quantitative Samples

(19 Samples)

    Composite Variability Samples

(10 Samples)

    Quantitative Samples

(3 Samples)

    Quantitative Sample

(1 Sample)

Lithium-bearing minerals     Spodumene     17.8     19.9     16.6     15.9     14.8
Petalite                    
Lepidolite                    
Zinnwaldite                    
    Holmquistite             0.5        
Non-lithium bearing minerals     82.2     80.1     82.9     84.1     85.2
Total     100     100     100     100     100
               

Piedmont has been advised that the character of its ore body is unusual
and highly positive, which will allow for a simplified flowsheet to
produce strong lithium recoveries. Many of the spodumene projects
currently producing or under development contain multiple
lithium-bearing minerals (petalite, lepidolite, zinnwaldite, etc. as
well as spodumene).

Keith D. Phillips, President and Chief Executive Officer, commented: “As
the market’s understanding of lithium processing evolves, it will become
increasingly clear that mineralogy and metallurgy are the fundamental
building blocks of a successful hard-rock lithium business.
Our
testwork confirms what we have always suspected – the Carolina
Tin-Spodumene Belt is exceptional not only in scale but in terms of
mineralogy.
When combined with the shallow nature of our ore body
and the capital and operating cost advantages of our location, we are
excited about the upcoming resource, metallurgical and scoping study
updates.

Click
here to view the full ASX Announcement.